Optimising gravel pack simulations with OpsLink and Equations (Aug 2026)
We’re excited to host a webinar showcasing two major enhancements in our newest PackPro release: OpsLink and Equations — powerful tools designed to transform how engineers model and evaluate well completions.
🔗 OpsLink
OpsLink connects multiple operations into one continuous simulation flow. Each operation automatically picks up where the previous one left off, making it easier to explore different operational sequences, reduce manual setup time, and run more realistic gravel‑pack simulations.
🧮 Equations
Our new Equations feature lets engineers build custom logic directly into their models. Define and apply equations across specific ranges to incorporate engineering judgment, enhance precision, and accelerate sensitivity studies.
Together, these new capabilities help engineers simulate real-world completions more efficiently, make better decisions, and reduce uncertainty.
Led by
Ramy Hatem