In this webinar, we discuss the use of diverter subs with shunt tubes during gravel packing to reduce the pressure seen in the open hole and prevent fracturing.
After a brief review of shunted gravel packing, we discuss what a diverter sub is and how it affects packing. We then demonstrate how modelling can be applied to determine the optimum number and placement of the diverter subs in the completion.